翻訳と辞書
Words near each other
・ Nuremberg Toy Museum
・ Nuremberg Transport Museum
・ Nuremberg trials
・ Nuremberg Trials (film)
・ Nuremberg Trials bibliography
・ Nuremberg U-Bahn
・ Nuremberg v. Konrad Schott von Schottenstein
・ Nuremberg Zoo
・ Nuremberg, Pennsylvania
・ Nuremberg-Kleinreuth radio transmitter
・ Nuremberg–Augsburg railway
・ Nuremberg–Bamberg railway
・ Nuremberg–Cheb railway
・ Nuremberg–Crailsheim railway
・ Nuremberg–Erfurt high-speed railway
Nuremberg–Feucht railway
・ Nuremberg–Munich high-speed railway
・ Nuremberg–Regensburg railway
・ Nuremberg–Roth railway
・ Nuremberg–Schwandorf railway
・ Nuremberg–Würzburg railway
・ Nureongi
・ Nureshk
・ Nuret-le-Ferron
・ Nurettin Canikli
・ Nurettin Demirtaş
・ Nurettin Ersin
・ Nurettin Gazi Misirli
・ Nurettin Kayaoğlu
・ Nurettin Sözen


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Nuremberg–Feucht railway : ウィキペディア英語版
Nuremberg–Feucht railway

|}
The Nuremberg–Feucht railway is a 12.5 km-long main-line railway in the German state of Bavaria, running from Nuremberg Hauptbahnhof to Feucht. It was built parallel with the Nuremberg–Regensburg railway during the first construction phase of the Nuremberg S-Bahn and opened on 21 November 1992.
==History==

The first demands for an S-Bahn network in greater Nuremberg were made in 1966. Deutsche Bundesbahn made a step in this direction in 1969 with increased services on the main lines during peak hours. The changes were applied to the Nuremberg–Feucht (–Altdorf) line and after that it was served at 30 minute intervals (Nuremberg–Feucht) or 60 minute intervals (Feucht–Altdorf). This service had to be withdrawn in the following years for operational reasons and also because of poor patronage, but Deutsche Bundesbahn still sought an improvement in services. In 1971, the then ''Bundesbahndirektion'' (railway division, BD) of Nuremberg was granted permission to develop solutions to improve services. The results were presented on 20 March 1975 as a "framework plan for the Nuremberg S-Bahn", which included an S-Bahn line from Nuremberg via Feucht to Altdorf. This was included as part of the "first stage” of construction of the Nuremberg S-Bahn adopted on 29 June 1979, as well as in the financial agreement closed on 2 November 1981, which allowed detailed planning to begin.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Nuremberg–Feucht railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.